Dynamo Interactive Graphic

Ground level within the area allows practitioners to understand why pressure is varying across an area.​

The green target pressure line shows the minimum pressure needed across the area, based on customer elevations and levels of service.​​

A PRV installed on the area inlet drops the pressure by a consistent amount.​

This total head gradient shows how much pressure is available throughout the area at peak flow prior to the installation of the PRV, showing the opportunity for reduction​.

The updated total head gradient shows the overall reduction in pressure which can be achieved by dropping the pressure until it reaches the green target pressure line. ​

Large users can have additional pressure or flow requirements, which should be considered at the design stage to ensure any service level requirements are met.​

Tall buildings can present a challenge for supply and may need additional pressure to meet service level requirements to feed roof tanks.​

In most cases, sufficient pressure reaching household properties forms the core design criteria for pressure management schemes.​

Considering any exports to cascading areas ensures that downstream areas receive the pressure that they need.